A two-position wall or ceiling bar with a smaller projection option for rooms where the mounting surface and the clearance envelope are the real decision.

REP wall or ceiling mount pull-up bar shown with its two projection positions and mounting brackets
Manufacturer image, captured 2026-08-08. Specifications remain source-bound below.Image source

Best fit when

  • A verified stud-mounted room where 14- or 26-inch projection changes the fit
  • People who want a narrower depth choice and a 50-inch total frame width

Choose another path when

  • You cannot confirm the mounting surface or the manufacturer's installation conditions
  • You need a no-drill or daily-reset product

Training jobs

What earns the floor space.

  1. 01Add a fixed pull-up and hang station with two bar positions
  2. 02Attach bands, rings, or straps to one mounted bodyweight station

Sourced specifications

Facts with a visible source.

Bar diameter
1.25 in listed by REP
Source
Frame width
50 in total width and 46 in usable width listed by REP
Source
Projection choices
14 in or 26 in from the wall or ceiling
Source
Mounting condition
REP describes installation into wall studs with included hardware
Source

Test queue

The protocol is assigned. The result is not.

Assigned protocol / version 1.0Pull-up Bar Test Protocol

Documents one mounted pull-up bar sample's geometry, hardware boundary, clearance, grip surface, controlled use setup, storage, and ownership condition without certifying a wall, ceiling, installation, or user's movement capacity.

Hands-on gate
3 measurements / 4 observations
Long-term gate
90 days / 20 sessions

0 completed first-party sessions. This record remains spec-reviewed, and no measurement or use result is implied.

  1. 01
    Bar dimensions

    Record the visible bar diameter and usable width at repeatable points.

    3x
  2. 02
    Mounting depth

    Record the bar's extension from the mounting surface at the installed position.

    3x
  3. 03
    Hardware inventory

    Separate included product components from the fasteners and structural work required for installation.

    2x
  4. 04
    Clearance envelope

    Observe whether the installed bar has the declared open space for the planned non-impact movement boundary.

    3x
  5. 05
    Mounting condition

    Record visible changes in brackets, fasteners, surface, and bar alignment after controlled setup checks.

    3x
  6. 06
    Grip surface

    Document the stated and observed surface format without converting finish into a universal grip-performance claim.

    3x
  7. 07
    Controlled-use entry

    Record the entry and exit path for a qualified controlled-use session before any loaded or dynamic movement.

    3x
  8. 08
    Ownership condition log

    Record changes in finish, fasteners, brackets, bar alignment, and surrounding surface over time.

    1x
Read the complete protocol registry

Tradeoffs

What the recommendation does not hide.

  • The two projection positions help a room fit but still require permanent installation and overhead clearance
  • A published load rating is conditional on proper mounting and is not a building-structure certification